The used OCPP version or version scopes, functions, interfaces, and project-specific modifications are defined and documented during technical evaluation.
This page describes the technical steps, documentation outputs, and allocation of responsibilities for the defined ChargeSphere.OCPP operational scope.
Clarifying the operational scope
A traceable integration plan starts with the constraints of the target architecture. The relevant technical dependencies are systematically assessed before the defined operational scope is documented.
Target architecture
The charging station's existing hardware, firmware, system components, and technical boundaries are captured as the starting point.
Interfaces
The connection between the charging station and the backend system is assessed together with the relevant interfaces and dependencies.
Configuration and diagnostics
Configuration requirements, diagnostic paths, and project-specific modifications are identified and scoped.
Test environment
The target system, test configuration, and expected results are defined for testing and validation.
From scope to technical documentation
The process links the technical evaluation to the description of the target architecture, the agreed activities, and the documentation of results.
Clemios supports agreed integration, testing, and validation activities for the defined ChargeSphere.OCPP operational scope.
Technical validation is not equivalent to formal OCPP certification, complete conformance, or universal interoperability.
-
1
Capture the starting point
Technical requirements, system boundaries, and the evaluation objective are gathered and reviewed.
-
2
Describe the architecture
The integration point, interfaces, dependencies, and project-specific modifications are described.
-
3
Agree the activities
Testing and technical validation activities are aligned with the defined operational scope and test environment.
-
4
Document the results
Results, known limitations, and open items are recorded for the defined operational scope.
Technical outputs and documentation
The results to be recorded depend on the defined operational scope. The documentation provides traceability between the operational scope, the test basis, and the known limitations.
The following items describe possible outputs of the technical evaluation and the agreed integration, testing, and validation activities. They do not constitute a standard package that is automatically included.
-
Interface definition
Defined integration points, assumptions, and technical dependencies.
-
Integration configuration
Documented configurations and project-specific modifications within the defined operational scope.
-
Test and validation plan
Documented test environment, verification steps, and expected results.
-
Issue classification
Observed deviations and open items are classified and documented by severity and status.
-
Technical documentation
Agreed integration information for technical assessment.
-
Evidence references
References linking the results to the test basis, operational scope, and known limitations.
Responsibilities within the target architecture
The technical assessment distinguishes the defined ChargeSphere.OCPP operational scope from the tasks and decisions relating to the complete OEM target architecture.
Clemios
- Defined ChargeSphere.OCPP operational scope
- Integration information and technical documentation
- Agreed integration, testing, and validation activities
OEM
- Target architecture and charging-station hardware and firmware
- System integration and assessment in the target system
- Technical acceptance, product approval, and series-production release
Technical acceptance of the agreed operational scope is performed by the OEM.
OEM acceptance is not formal OCPP certification and not general production or series release by Clemios.
Request a technical evaluation
For an initial assessment, it is helpful to provide information about the company, charging station, firmware, backend system, intended operational scope, and test environment.
The technical scope and integration prerequisites are clarified during the technical evaluation.
Request a technical evaluation